Having assessed three broad route corridors, we have identified a preferred route corridor in which the electrical connection could be routed largely using underground cable to minimise the overall effect on agricultural land use and known environmentally sensitive areas, in particular those either side of the River Trent.

7. Preferred route corridor

Please provide any comments you have on the preferred route corridor we are proposing the electrical connection from the solar energy park into Cottam substation could be built in largely using underground cable.

For more detailed information refer to PEI Report Volume 1, Chapter Three: Alternatives & Design Evolution.